
New TopShim run:

version = topshim 2.0.0
date = 2024-12-13
time = 18:17:41.918
command = topshim 

FINE SHIMMING

Parameters:

probe = Z820201_0105
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 1.0 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.476

shim changes: 
Z	-435
Z2	-329
Z3	-577
Z4	-3389
Z5	-2480

duration = 55 sec
completed successfully
finished Fri Dec 13 18:18:35 2024


========================================================================
